For the PYROLY-EKOPYR 800, the gross returns per month are sufficient to cover the complete cost of the Plant, based upon the constant and un-interrupted supply of a minimum waste of 800 m3 ( 500 tonnes ) shredded waste.

Complex “PYROLY-EKOPYR” allow you to obtain the maximum output electric power, heat, petroleum product and other combustible materials from the processing of rubber and plastic.In addition to the received oil products, the complex provides the entire project with electricity and heat.The Complex “PYROLY-EKOPYR” is 100% eco-friendly, the complex has no release into the atmosphere of fumes, vapors and emissions of any harmful substances into the environment.

Output performance​

Pyrolysis liquid

7000 tonnes/month

Electricity

5,6 MWt/h 400 Volt

Diesel EURO5

3160 tonnes/month

Petrol Аi92

1760 tonnes/month

Fuel М100

844 tonnes/month

Heavy Tar

348 tonnes/month

Syngas

2160 tonnes/month

Tech.carbon

1440 tonnes/month

Our technology is very unique and the only one of its kind in the world (2018). Unlike the existing waste to fuel plants which use outdated materials and conversions processes, this technology is based on a design which improves efficiency and reduces carbon footprint. This eco-friendly design is built around the following design principles:
The PYROLY-EKOPYR Project
Main Ingener Team

The Plant works – 340 days / year.

Plant’s main areas:

  • Waste sorting area: selection of glass, metal, stone, reinforced concrete, checking materials for radioactivity.
  • The area of grinding raw materials to a certain fraction.
  • Plot of mechanisms for moving raw materials.
  • A site for pyrolysis processing of raw materials.
  • Park of transitional tanks for pyrolysis oil.
  • Pumping section.
  • Carbon black warehouse.
  • Site for non-pyrolysis materials.
  • Power station.
  • Plot of pyrolysis liquid separation into fractions.
  • Park of transitional tanks for finished products.
  • Finished product delivery area.

Production time 10 – 12 months.

Project design time 10 – 12 months.