PYROLY-EKOPYR 200

image
For the PYROLY-EKOPYR 200, the gross returns per month are sufficient to cover completely plants operational expenses, based upon the constant and un-interrupted supply of a minimum waste of 200 m3 (125 tonnes) shredded waste per day.
Complex “PYROLY-EKOPYR” allow you to obtain the maximum output electric power, heat, petroleum product and other combustible materials from the processing of rubber and plastic.In addition to the received oil products, the complex provides the entire project with electricity and heat.The Complex “PYROLY-EKOPYR” is 100% eco-friendly, the complex has no release into the atmosphere of fumes, vapors and emissions of any harmful substances into the environment.

Output performance

image

Pyrolysis oil

1762.2 tonnes/month
image

Electricity

1,4 MWt/h 400 Volt
image

Diesel EURO5

810 tonnes/month
image

Petrol Аi92

504 tonnes/month
image

Fuel М100

211 tonnes/month
image

Heavy Tar

90 tonnes/month
image

Syngas

540 tonnes/month
image

Carbon Black

360 tonnes/month
Our technology is very unique and the only one of its kind in the world (2024). Unlike the existing waste to fuel plants which use outdated materials and conversion processes, this technology is based on a design which improves efficiency and reduces carbon footprint to a competitive level.
Main features and advantages

The Plant works – 340 days / year.

Plant’s main areas:
Production time 8 – 10 months.