Sustainable Waste-to-Energy Solutions

Specially designed installation under the conditions of the customer.

 

 

The PYROLY pyrolysis installation can be customized to any capacity and tailored for any specific type of raw material. When designing the desired installation, its performance can be calculated proportionally based on the performance of other installations. However, it’s important to note that installation prices do not change proportionally. The cost calculation for the installation is conducted after the primary contract of intent has been finalized.

Output performance​​

Pyrolysis oil

At the request of the customer.​

Electricity

At the request of the customer.

Diesel EURO5

At the request of the customer.

Petrol Аi92

At the request of the customer.

Fuel М100

At the request of the customer.

Heavy Tar

At the request of the customer.

Syngas

At the request of the customer.

Carbon Black

At the request of the customer.​

Our technology is very unique and the only one of its kind in the world (2024). Unlike the existing waste to fuel plants which use outdated materials and conversion processes, this technology is based on a design which improves efficiency and reduces carbon footprint to a competitive level.
Main features and advantages

The Plant works – 340 days / year.

Plant’s main areas:

Waste sorting area: selection of glass, metal, stone, reinforced concrete, checking materials for radioactivity.

  1. The area of grinding raw materials to a certain fraction.
  2. Plot of mechanisms for moving raw materials.
  3. A site for pyrolysis processing of raw materials.
  4. Park of transitional tanks for pyrolysis oil.
  5. Pumping section.
  6. Carbon black warehouse.
  7. Site for non-pyrolysis materials.
  8. Power station.
  9. Plot of pyrolysis liquid separation into fractions.
  10. Park of transitional tanks for finished products.
  11. Finished product delivery area.

Production time 6-9 months, depending on the complexity of the project and without taking into account the design period.